Runnymede

Runnymede/RU.26/1369

Scotland Bridge Road Footbridge

REGISTERED
Reference
Runnymede/RU.26/1369
Authority
Runnymede
Address
Scotland Bridge Road Footbridge
Status
REGISTERED
Received
16 Oct 2026
Started
16 Oct 2026
Source council
Runnymede
Council source record
View public record
Public data licence
Open Government Licence v3.0
Record updated
17 Oct 2026
SEO index generated
20 Oct 2026
Open this site in plotEdge

Location

Static location map showing the position of planning application Runnymede/RU.26/1369 in Runnymede

Approximate location

Proposal

The existing 1.7-metre-wide Scotland Bridge Road Footbridge has reached the end of its maintainable life, and routine maintenance is no longer a viable long-term option to ensure public safety. Replacement is urgently required to prevent closure of this vital pedestrian link, which is heavily relied upon by local schools, residents, and businesses. As part of this project, we will be replacing the current 1.7m wide path with a 3 wide footbridge. To meet Surreys commitment for accessibility and active travel, on all projects, we must consider how we can improve routes for community links. The current 1.7m wide path is too narrow for shared use which means disabled access, cyclist and prams are frequently required to stop or give way. Widening the footbridge to a 3m will greatly improve this situation and provide a safer environment for all users. There are five oak trees located near the existing structure. The project team has carefully evaluated these trees to minimise ecological impact. Unfortunately, the root systems of two trees adjacent to the structure (designated T2 and T3 on WT180068-ATRL-SBR-XX-SK-CB-00002) restrict the required new foundations of the footbridge. Even a like-for-like replacement matching the existing footprint would require larger foundations to meet modern design standards. A specialised root survey confirmed that tree roots are too close to the construction area, and the necessary excavation and foundation works will cause too much damage for the trees to be retained. So removal of T2 (Oak) and T3 (Oak) are required under the footbridge replacement scheme. The project team explored multiple design alternatives to avoid tree removal. The proposed scheme represents the most balanced approach. Alternative bridge alignments were considered but ultimately discounted, as they would have resulted in greater ecological disruption, additional land acquisition and negative impact on the canal and surrounding habitat.

Key dates

  1. Received 16 Oct 2026
  2. Started 16 Oct 2026

Planning history / related applications

No related planning applications have been identified in the current public OGL dataset.

Inside plotEdge

Go beyond the public record

This page is the public OGL record. plotEdge adds the private intelligence layer for this site - open it in the app to unlock:

  • Ownership & title Registered owner and title from HM Land Registry.
  • Viability & build potential Site scoring and development upside.
  • Constraints Flood risk, green belt, conservation areas and designations.
  • Approval signal Planning risk and approval-likelihood analysis.
  • Comparable applications Decisions on similar nearby sites, side by side.
  • Status alerts Get notified the moment this application changes.
Open this site in plotEdge

Source: public planning application data from Runnymede, reused under the Open Government Licence v3.0. View the council source record. Council documents and drawings are not republished on plotEdge.