Greenwich

Greenwich/25/4113/NM

Phase 5, Building A and B, Kidbrooke Village

Decided | Approve
Reference
Greenwich/25/4113/NM
Authority
Greenwich
Application type
NM
Address
Phase 5, Building A and B, Kidbrooke Village
Status
Decided
Decision
Approve
Received
9 Dec 2025
Started
9 Dec 2025
Decided
29 Apr 2026
Source council
Greenwich
Council source record
View public record
Public data licence
Open Government Licence v3.0
Record updated
6 Aug 2026
SEO index generated
7 Aug 2026
Open this site in plotEdge

Location

Static location map showing the position of planning application Greenwich/25/4113/NM in Greenwich

Approximate location

Proposal

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a Non-Material Amendment to vary Conditions 2 (Approved Plans), 10 (Maximum Floor Space Restrictions), Condition 60 (District Heat Network), 61 (Energy Centre (EC) ? Communal/District Heating Network (DHN)/ Connection to Kidbrooke site wide DHN EC and Decarbonisation) and 62 (Energy and CO2) of Planning Permission 23/3976/F in relation to Phase 5 Building A and B comprising amendments to the following: Site Plan Arrangements: Reduction of footprint from wall buildup (from 476mm to 310mm). Apartment layout and mix revisions from changes to building footprint. Rearrangement of building location on site to reflect footprint reduction. Layout Changes: Core revisions to comply with fire regulations. Placement of substation on ground floor of Building A. Re-location of substation in Building B3 to Building B1 Lower ground floor changes from updated plant room strategy and ramp access widening Refuse stores amendments Cycle store amendments Building Massing: All typical levels floor to floor height reduced from 3075mm to 3000mm resulting in reduced building 'AOD' height. All upper-level terraces removed. Facade Alterations: Balcony doors changed from sliding (2 pane windows/doors) to inward opening swing (3 pane windows/doors). Window positioning adjusted Facade changes at ground level to reflect relocation of substation. Facade changes at ground level to reflect updated plant room strategy and ramp access widening. Balconies amended from top fix balustrading to side fix balustrading. Use of Sustainabrick at first floor level and above.

Key dates

  1. Received 9 Dec 2025
  2. Started 9 Dec 2025
  3. Decided 29 Apr 2026

Planning history / related applications

No related planning applications have been identified in the current public OGL dataset.

Inside plotEdge

Go beyond the public record

This page is the public OGL record. plotEdge adds the private intelligence layer for this site - open it in the app to unlock:

  • Ownership & title Registered owner and title from HM Land Registry.
  • Viability & build potential Site scoring and development upside.
  • Constraints Flood risk, green belt, conservation areas and designations.
  • Approval signal Planning risk and approval-likelihood analysis.
  • Comparable applications Decisions on similar nearby sites, side by side.
  • Status alerts Get notified the moment this application changes.
Open this site in plotEdge

Source: public planning application data from Greenwich, reused under the Open Government Licence v3.0. View the council source record. Council documents and drawings are not republished on plotEdge.