Redcar and Cleveland
Redcar and Cleveland/R/2024/0678/CD
of cathodic protection posts and marker posts; (c) surface water drainage; and (d) works involving trenchless technologies including their location. (3) No part of the authorised development comprised in Work No. 2B may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp, STDC and the TG entities)— (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings, structures and above ground apparatus; (b) hard standings (c) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities; and (d) works involving trenchless technologies including their location. (4) No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the 275 kilovolt electrical cables and control system cables running from Work No. 1 to the existing substation at Tod Point; (b) the connections within the existing substation at Tod Point, including electrical cables, connections to the existing busbars and new, upgraded or replacement equipment; and (c) works involving trenchless technologies including their location. (5) No part of the authorised development comprised in Work No. 4 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)— (a) route and method of construction of the water supply pipelines; and (b) works involving trenchless technologies including their location. (6) No part of the authorised development comprised in Work No. 5 may commence, save for permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of construction of any new wastewater water pipelines above mean low water springs; and (b) works involving trenchless technologies including their location. (7) No part of the authorised development comprised in Work No. 6 may commence, save for the permitted preliminary works, until details of the following, to the extent that they are above mean low water springs, for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the carbon dioxide gathering network pipelines and any electrical supply, telemetry and other apparatus; (b) the number and
- Reference
- Redcar and Cleveland/R/2024/0678/CD
- Authority
- Redcar and Cleveland
- Application type
- Condition Discharge
- Address
- of cathodic protection posts and marker posts; (c) surface water drainage; and (d) works involving trenchless technologies including their location. (3) No part of the authorised development comprised in Work No. 2B may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp, STDC and the TG entities)— (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings, structures and above ground apparatus; (b) hard standings (c) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities; and (d) works involving trenchless technologies including their location. (4) No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the 275 kilovolt electrical cables and control system cables running from Work No. 1 to the existing substation at Tod Point; (b) the connections within the existing substation at Tod Point, including electrical cables, connections to the existing busbars and new, upgraded or replacement equipment; and (c) works involving trenchless technologies including their location. (5) No part of the authorised development comprised in Work No. 4 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)— (a) route and method of construction of the water supply pipelines; and (b) works involving trenchless technologies including their location. (6) No part of the authorised development comprised in Work No. 5 may commence, save for permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of construction of any new wastewater water pipelines above mean low water springs; and (b) works involving trenchless technologies including their location. (7) No part of the authorised development comprised in Work No. 6 may commence, save for the permitted preliminary works, until details of the following, to the extent that they are above mean low water springs, for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the carbon dioxide gathering network pipelines and any electrical supply, telemetry and other apparatus; (b) the number and
- Status
- Approved Parish(es)
- Decision
- CONDITION DISCHARGE GRANTED
- Received
- 10 Oct 2024
- Started
- 10 Oct 2024
- Decided
- 5 Dec 2024
- Source council
- Redcar and Cleveland
- Council source record
- View public record
- Public data licence
- Open Government Licence v3.0
- Record updated
- 9 Jul 2026
- SEO index generated
- 24 Jul 2026
Location
Proposal
of the preferred option where the risk assessment indicates that remediation is required in order for the relevant area of land not to meet the definition of “contaminated land” under Part 2A (contaminated land) of the Environmental Protection Act 1990(a); (c) where the risk assessment carried out under sub-paragraph (a) identifies the need for remediation, a remediation strategy which must include— (i) the preferred option for remediation to ensure that the site will not meet the definition of “contaminated land” under Part 2A (contaminated land) of the Environmental Protection Act 1990; and (ii) a verification plan, providing details of the data to be collected in order to demonstrate that the works set out in the remediation scheme submitted for approval under this sub-paragraph are complete; (d) a materials management plan that is in accordance with the prevailing code of practice relevant to such plans, which sets out long-term measures with respect to any contaminants remaining on the site during and after the authorised development is carried out; (e) details of how any unexpected contamination will be dealt with (f) an update to the hydrogeological impact assessment including hydrogeological conceptual model that is informed by any further ground investigation reports and groundwater monitoring in addition to the information in Chapter 10 of the environmental statement; (g) a long term monitoring and maintenance plan in respect of contamination, including details of (but not limited to) monitoring of groundwater and surface water, appropriate screening criteria, and a time-table of monitoring and submission of monitoring reports, and which must include any necessary contingency action or mitigation measures arising from the matters reported; and (h) a plan for managing or otherwise decommissioning any boreholes installed for the investigation of soils, groundwater or geotechnical purposes, including details of how redundant boreholes are to be decommissioned in order to prevent risk of groundwater pollution, how any boreholes that need to be retained for monitoring purposes will be secured, protected and inspected, and including a requirement for appropriate validation records within a report to be submitted to demonstrate that all boreholes which are no longer required have been decommissioned in accordance with best practice. (3) The authorised development, including any remediation and monitoring, must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority following consultation with the Environment Agency. (4) Following the implementation of the remediation strategy approved under sub-paragraph (3), a verification report, based on the data collected as part of the remediation strategy and demonstrating the completion of the remediation measures must be produced and supplied to the relevant planning authority and the Environment Agency. (5) Where the verification report produced under sub-paragraph (4) does not demonstrate the completion of the remediation measures, a statement as to how any outstanding remediation measures will be addressed must be supplied to the relevant planning authority and the Environment Agency at the same time as the verification report (6) The outstanding remediation measures must be completed to the reasonable satisfaction of the relevant planning authority, after consultation with the Environment Agency and STDC, by the date agreed with that authority. (7) As an alternative to seeking an approval under sub-paragraph (1), the undertaker may instead submit for approval by the relevant planning authority, following consultation with the Environment Agency and STDC, a notification that the undertaker instead intends to rely on any scheme to deal with the contamination of land (including groundwater) which relates to any part of Work Nos. 1, 7, 9A or 10 that has been previously approved by the relevant planning authority pursuant to an application for planning permission or an application to approve details under a condition attached to a planning permission. (8) If a notification under sub-paragraph (7) is— (a) approved by the relevant planning authority following consultation with the Environment Agency then the undertaker must implement the previously approved scheme and an approval under sub-paragraph (1) is not required; or (b) not approved by the relevant planning authority following consultation with the Environment Agency then an approval under sub-paragraph (1) is required. (9) Sub-paragraphs (1) to (8) do not apply to any part of the Order land where the undertaker demonstrates to the relevant planning authority following consultation with the Environment Agency that the relevant part of the Order land is fit for the authorised development through the provision of a remedial validation report (which must include a risk assessment, details of any planning permission under which remediation works were carried out and any ongoing monitoring requirements) and the relevant planning authority notifies the undertaker that it is satisfied that the relevant part of the Order land is fit for the authorised development on the basis of that report. (10) The undertaker must comply with any ongoing monitoring requirements and any activities identified as necessary by the monitoring contained within the documents submitted to and approved by the relevant planning authority pursuant to sub-paragraph (9). 5 15.—(1) No part of the authorised development may commence until further survey work for that part has been carried out to establish whether any protected species are present on any of the land affected, or likely to be affected, by that part of the authorised development. 47 (2) Where a protected species is shown to be present, no authorised development of that part must commence until a scheme of protection and mitigation measures has been submitted to and, following consultation with Natural England, approved by the relevant planning authority. (3) The authorised development must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority. (4) In this requirement, “protected species” has the same meaning as in regulations 42 and 46 of the Conservation of Habitats and Species Regulations 2017(a). If you are unable to find the
Key dates
- Received 10 Oct 2024
- Started 10 Oct 2024
- Decided 5 Dec 2024
Planning history / related applications
No related planning applications have been identified in the current public OGL dataset.
Inside plotEdge
Go beyond the public record
This page is the public OGL record. plotEdge adds the private intelligence layer for this site - open it in the app to unlock:
- Ownership & title Registered owner and title from HM Land Registry.
- Viability & build potential Site scoring and development upside.
- Constraints Flood risk, green belt, conservation areas and designations.
- Approval signal Planning risk and approval-likelihood analysis.
- Comparable applications Decisions on similar nearby sites, side by side.
- Status alerts Get notified the moment this application changes.
Source: public planning application data from Redcar and Cleveland, reused under the Open Government Licence v3.0. View the council source record. Council documents and drawings are not republished on plotEdge.